This document is a pdf (Acrobat Reader) file. To view the document click on the link below. To save the document, right-click on the link and select 'Save target As' from the context menu. View/download the document here.
Snowy Mountains Hydro-Electric Authority.
This media release in October 1996 announces the search for those who built the hydro-electric project to join in celebrations of the scheme’s 50th year in 1999.
unknown
29 March 2002
source not available
pdf (Acrobat Reader);
--
--
No transcript for this Document.
Visit the multicultural Library for other documents, video, audio and images.